Over the years
The Iona Gas Field was first discovered in 1988 and subsequently drilled before being converted into a gas storage facility in 1998. The Iona facility was officially commissioned and began operations in July 1999.
1988
Iona Gas Field discovered
Iona 1 drilled
1992
Iona 1 completed for production through NPPS
1994
Iona 2 completed for production through NPPS
1998
Esso’s Longford Gas Plant extended outage
Commenced Iona conversion to gas storage facility
1999
Commenced gas production operations into SWP
2000
Commenced gas storage operations
2003
Connected to SEAgas Pipeline
2004
Moomba Gas Plant extended outage
(Iona main source of gas supply to SA)
2006
Commenced Casino gas processing through Train 1
2009
Commenced gas storage operations at Wallaby Creek and North Paaratte fields
2010
Redevelopment increases withdrawal, processing and storage. Iona – Otway Gas Plant pipeline connected. Addition of Train 2 increases processing capacity
2013
Connected to Mortlake Pipeline
2015
Storage capacity increased to 23.5PJ
2016
Iona purchased by Lochard Energy
2017
Iona 3 & well workovers
2018
Drilling of Iona 7
Over the years
The Iona Gas Field was first discovered in 1988 and subsequently drilled before being converted into a gas storage facility in 1998. The Iona facility was officially commissioned and began operations in July 1999.
1988
Iona Gas Field discovered
Iona 1 drilled
1992
Iona 1 completed for production through NPPS
1994
Iona 2 completed for production through NPPS
1998
Esso’s Longford Gas Plant extended outage
Commenced Iona conversion to gas storage facility
1999
Commenced gas production operations into SWP
2000
Commenced gas storage operations
2003
Connected to SEAgas Pipeline
2004
Moomba Gas Plant extended outage
(Iona main source of gas supply to SA)
2006
Commenced Casino gas processing through Train 1
2009
Commenced gas storage operations at Wallaby Creek and North Paaratte fields
2010
Redevelopment increases withdrawal, processing and storage. Iona – Otway Gas Plant pipeline connected. Addition of Train 2 increases processing capacity
2013
Connected to Mortlake Pipeline
2015
Storage capacity increased to 23.5PJ
2016
Iona purchased by Lochard Energy
2017
Iona 3 & well workovers
2018
Drilling of Iona 7